The coarse soil on the excavated ground is stripped and leveled with gravel. Special drainage pipes are laid for drainage in the gravel. Attention is paid to the slopes of the drainage pipes so that they can discharge the groundwater. In order to carry out this process properly, the thickness of the stone chips should not be less than 18 cm.
Recent Posts
- What to do after excavation? 23 juillet 2022
- How does the construction process work? 23 juillet 2022
- What process does the construction project begin with? 23 juillet 2022
- What is 1 class group A structure? 23 juillet 2022
- What does construction project mean? 23 juillet 2022
Laisser un commentaire